HVAC · State license
How to get an HVAC license in Georgia
State law and licensing-board sources · Last reviewed October 10, 2026
In Georgia, HVAC work is called "conditioned air contracting," and the license is the Conditioned Air Contractor license from the Division of Conditioned Air Contractors. There are two classes: Class I (residential and light commercial, smaller systems) and Class II (no size limit). Under a 2026 rewrite of the law (Act 472, in effect since July 1, 2026), Class I calls for 4 years of set experience and Class II for 5, plus EPA Section 608 certification (Type II; Class II also Type III), a duct design course and a passing score of 70 on a state exam. There is no state technician license, but anyone handling refrigerant needs the federal EPA Section 608 certification. [1][2][3][4]
New to the trade?
Starting from zero in Georgia
Georgia has no apprentice or technician HVAC license, so you don't register with the state. Start by getting hired by an HVAC (conditioned air) contractor, and get federal EPA Section 608 certification before you handle refrigerant. The contractor license later needs years of documented work as an installer, service technician and supervisor; a technical college HVAC diploma can count for up to 2 of those years. [1][4]
Register before you start work
No state registration The law's only conditioned air licenses are the Class I and Class II contractor licenses. [1]
Union HVACR apprenticeship entry
MTI's HVACR program: you must already work for a union (signatory) HVACR contractor and have 2 years of documented experience or a completed HVACR technical program Your driving record must support company vehicle use. [14]
Aptitude test
MTI: ACT WorkKeys Applied Math and Workplace Documents, at least Silver or Level 4 ($30 to $40 per section), then a $60 application and a drug test if conditionally accepted. [14]
Still in high school?
Georgia's Work-Based Learning program (state Department of Education) includes Youth Apprenticeship, which pairs high school coursework with paid work Its program site says students must be in grades 11 or 12, at least 16 and in good academic standing. Dual Enrollment lets Georgia high school students take college courses with standard tuition, mandatory fees and required books covered. The Department of Education's CTAE programs offer career pathways in high school. The 2026 law's school credit is for technical school diplomas and certificates; it doesn't mention high school courses. [1][16][17][18][19]
Where to apply in GeorgiaHow to get an apprenticeshipHelper jobs
Licensing office Georgia State Construction Industry Licensing Board, Division of Conditioned Air Contractors (Secretary of State) [6][12]
Georgia HVAC license at a glance
- Who issues licenses
- Division of Conditioned Air Contractors, State Construction Industry Licensing Board Georgia Secretary of State [12]
- Technician (employee) license
- None. The law's only conditioned air licenses are Class I and Class II contractor. [1]
- Application fee
- $110 (licensure by examination) [6]
On this page
- At a glance
- Starting from zero
- The license pathway
- Who needs a conditioned air license in Georgia
- Class I vs. Class II and the experience you need
- The exam
- Fees, renewal and continuing education
- Apprenticeships and training in Georgia
- If you're licensed in another state
- EPA Section 608: the federal certification you'll need
- Recent law changes: SB 125 (2025) and Act 472 (2026)
- Steps to get licensed
- Where to get the hours
- Licensed in another state?
- Questions people ask
The license pathway in Georgia
-
1
HVAC employee (no state license)
Georgia has no apprentice or technician HVAC license. The law expects each company office to have a licensed contractor supervising employees' installation and service work, and the experience it counts includes years as a lead mechanic and service technician. To handle refrigerant you need EPA Section 608 certification. [1][4]
-
2
Conditioned Air Contractor Class I (Restricted)
- 4 years of experience
- Board-approved heat loss/gain and duct design course (Board FAQ: Manual J and D)
- Yes, PSI, open book (listed references only), 100 scored questions, 70 to pass
- $110 application
- Every 2 years (odd years); 4 hours CE per year
Residential and light commercial: air conditioning and heat pumps up to 60,000 BTU of cooling and gas heat up to 175,000 BTU. Experience must include 2 years as a residential lead installer, 1 year as a service technician and 1 year of residential supervision, plus EPA 608 Type II certification. [1][3][6][7][8]
-
3
Conditioned Air Contractor Class II (Unrestricted)
- 5 years of experience
- Heat loss/gain and duct design course (Board FAQ: Manual J and D plus Manual N and Q, or Carrier Design 1, 2 and 3)
- Yes, PSI, open book (listed references only), 100 scored questions, 70 to pass
- $110 application
- Every 2 years (odd years); 4 hours CE per year
No limit on project size or equipment type, except boilers. Experience must include 2 years as a lead installer (at least 1 commercial, on systems above the Class I limits), 1 year in service and 2 years of commercial supervision, plus EPA 608 Type II and Type III certification. [1][3][6][7][8]
Who needs a conditioned air license in Georgia
Georgia law calls HVAC work conditioned air contracting: installing, repairing or servicing conditioned air systems or equipment. Under the 2026 law, that includes the electrical circuit from the panel to the equipment when the building's service is single-phase and not over 200 amps. Conditioned air equipment also covers the fuel gas piping on the outlet side of the gas meter.
Anyone who does, bids for or offers this work under a contract needs a license from the Division of Conditioned Air Contractors. A company can do it only if a licensed person works with it full time, and each branch office needs a licensee who supervises the employees' work there. Regular full-time employees working on their own employer's premises are exempt.
If you work under a licensed conditioned air contractor's contract, you don't need this license just to install duct systems, controls or insulation, but you do need it to install or repair a complete system. The 2025 version of the law said an employee paid only a salary or hourly wage wasn't a "conditioned air contractor"; the 2026 rewrite doesn't repeat that sentence, so if you plan to work as an HVAC technician, confirm with the Division.
You may not legally do licensed work until you hold an active license. [1][5][6]
Class I vs. Class II and the experience you need
- Class I (Restricted): the law calls it a "Residential and Light Commercial" license for air conditioning and heat pump systems of 60,000 BTU of cooling or less and gas heating of 175,000 BTU or less. The experience it lists is 2 years of residential installation as a lead mechanic, 1 year as a service technician and 1 year of residential supervisory experience: 4 years in all. You also need EPA 608 Type II and a Board-approved heat loss and gain and duct design course.
- Class II (Unrestricted): residential and commercial work "without limitations or restrictions on project size or equipment types," except boilers, which the Insurance and Safety Fire Commissioner licenses. You need 5 years: 2 years of commercial supervisory experience, 1 year as a service technician or service supervisor, and 2 years of installation as a lead mechanic, at least 1 of them commercial, on systems above 175,000 BTU of heating and 60,000 BTU of cooling. You also need EPA 608 Type II and Type III and the design course.
Schooling can count, based on the class time you completed: up to 2 years for a technical school or college diploma in air conditioning technology, engineering or engineering technology, or up to 1 year for a vocational-technical certificate.
The law asks for a signed affidavit from an architect, professional engineer, building official or inspector, or licensed conditioned air contractor who supervised or oversaw your work, one from each such person. The Board's rule, not yet updated, still asks for three references from the same kinds of people. [1][3]
The exam
Once the Board approves your application, you register with PSI, the state's testing vendor. The approval letter is valid for one year.
The exam has two parts, each 3.5 hours, with a break between. It has 100 scored questions plus 20 unscored "beta" questions. You may bring only the references on the Board's list, such as the Georgia Mechanical and Gas Codes, Manuals J and D, and a refrigeration textbook. Notes and photocopies aren't allowed, but tabs and highlighting are. Since May 1, 2026 the exam uses the 2024 Georgia Mechanical and Gas Codes.
The passing score is a scaled 70, the minimum the law sets. If you fail twice, you must finish a Board-approved review course before a third try. See the PSI candidate handbook for the full reference list. [1][3][7][8]
Fees, renewal and continuing education
- Application by exam (Class I or II): $110.
- Business registration: no fee.
- Reinstatement (lapsed less than 3 years): $310. Lapsed 3 years or more: $310 and, per the Board's guide, you must pass the exam again (the 2026 law says the extra requirements "may include" a new exam).
- Renewal: licenses last two years; renew online in GOALS by November 30 of odd-numbered years, with a late period from December 1 to 31 (the law allows up to 31 days).
- Continuing education: the 2026 law leaves the number of hours to the Division and says hours can't carry over. The Board's FAQ says 4 hours each year (8 per renewal), and licensed professional engineers are exempt.
The Secretary of State keeps a current fee schedule; PSI's exam fee is separate. [1][6][7]
Apprenticeships and training in Georgia
Georgia's law asks for experience as a lead mechanic, a service technician and a supervisor, plus an EPA certification and a duct design course.
- United Association (UA) local unions run registered apprenticeships that include HVACR; they typically last five years.
- The U.S. Department of Labor's Apprenticeship Job Finder lists open apprenticeship jobs from employers.
- A vocational-technical certificate can count for up to 1 year of the experience requirement, and a technical diploma in air conditioning technology, engineering or engineering technology for up to 2.
If you're licensed in another state
The 2026 law lets the Division, at its discretion, license you without the exam if your state's requirements are "substantially equal" to Georgia's, you have been "principally engaged" in the work for at least 2 years right before you apply, and your state gives Georgia licensees the same privilege. But the Board's FAQ says: "Reciprocity with other states is not offered at this time." Board rules allow the Divisions to sign written reciprocity agreements, but none is currently offered for conditioned air. Plan to apply by examination, and confirm with the Board.
Military members and veterans may qualify for exam preference points or faster processing. The 2026 law also has a committee that decides which military specialties meet the requirements for a Class I license, with expedited licensing for applicants who apply within two years of discharge. [1][6][7][11]
EPA Section 608: the federal certification you'll need
Georgia's 2026 law makes EPA Section 608 Type II certification a requirement for Class I, and Type II and Type III for Class II. Federal rules require it anyway: technicians who maintain, service, repair or dispose of equipment that could release refrigerant must be certified under Section 608. It's earned by passing an EPA-approved test, and it doesn't expire.
Read our EPA 608 certification guide for the four types and how the test works. [1][4]
Recent law changes: SB 125 (2025) and Act 472 (2026)
In 2026 Georgia repealed and rewrote the whole law for electrical, plumbing, conditioned air, low voltage and utility contractors (Chapter 14 of Title 43 of the Georgia Code). The bill was Senate Bill 553, signed May 11, 2026 as Act 472, and it took effect July 1, 2026. For conditioned air it wrote each class's scope and experience mix into the law, required EPA 608 Type II (Class I) or Type II and Type III (Class II), replaced references with experience affidavits, counted a year of full-time experience as at least 2,000 hours, and left continuing-education hours to the Division.
As of October 10, 2026, the Board's rule (Rule 121-3-.04), FAQ and how-to guide still show the older wording, such as three references and "Type II or higher." Where they differ from the law, confirm with the Division.
The year before, Senate Bill 125 (2025) had spelled out the electrical work included in conditioned air contracting and changed the continuing-education wording from "not more than" to "not less than" four hours a year. [1][2][3][5][6][7]
Steps to get licensed in Georgia
Get EPA Section 608 certification
The 2026 law requires EPA Section 608 Type II certification for Class I and Type II and Type III for Class II (the Board's FAQ still says "Type II or higher"). Federal law requires it to handle refrigerant anyway. See our EPA 608 guide. [1][4][7]
Build the experience
Build 4 years of experience for Class I or 5 for Class II, in the specific mix of lead installer, service and supervisory roles the law lists. Full-time experience means at least 2,000 hours in a year. [1][3]
Take the required design courses
Complete a Board-approved heat loss/gain and duct design course. The Board's FAQ asks for Manual J and D (Class I) and, for Class II, also Manual N and Q or Carrier Design 1-3. [1][6][7]
Apply in GOALS
Create an account in the Secretary of State's GOALS portal and file the Licensure by Examination application with the $110 fee, a background check and your certificates. See the how-to guide. The 2026 law asks for signed experience affidavits from the people who supervised you; the Board's checklist still asks for three references, so confirm which it wants. [1][3][6]
Pass the PSI exam
After the Board approves you, PSI sends instructions to register. The approval letter is good for one year, and you need a scaled score of 70. [7][8]
Register your business
File a Business Registration (no fee) to link your license to a company, and show the GA. REG. number on vehicles, ads and invoices. [1][6][13]
Where to get the hours
Programs that train HVAC technicians in or for Georgia, from their own official pages. Listed by type, not ranked.
-
Union
United Association (UA) pipe trades apprenticeships
The UA's registered apprenticeships include an HVACR track and typically last five years, with paid work plus classroom training. Find a local union through the UA. [9]
-
Other
The U.S. Department of Labor's search tool for open apprenticeship jobs by occupation and location, including Georgia. [10]
Licensed in another state?
We didn't find a reciprocity agreement published by the licensing office for this license. Ask the office how it treats an out-of-state license or experience before you apply.
Also listed by: Delaware, North Carolina, Texas, Utah (their own boards list Georgia as a partner; check both sides before you move).
Questions people ask
Do I need a license to be an HVAC technician in Georgia?
Georgia has no technician license; the only conditioned air licenses are Class I and Class II contractor, and the law expects licensed contractors to supervise employees' work. The 2026 law no longer spells out the old exclusion for wage employees, so confirm with the Division. You need EPA Section 608 certification to handle refrigerant. [1][4]
What's the difference between Class I and Class II?
Class I is for residential and light commercial systems of up to 60,000 BTU of cooling and 175,000 BTU of gas heat and calls for 4 years of set experience. Class II has no size limit (except boilers) and needs 5 years, including commercial work and supervision. [1][3]
Is the Georgia conditioned air exam open book?
Yes, but only with the references on the Board's list. Notes and photocopies aren't allowed. The exam has 100 scored questions, and you need a scaled score of 70. [8]
Does Georgia accept HVAC licenses from other states?
The Board says reciprocity with other states is not offered at this time, so out-of-state contractors apply by examination. The 2026 law does allow licensing without an exam for people from substantially equal states that return the favor, so ask the Division if your state qualifies. [1][7]
Sources (19)
- Senate Bill 553 (As Passed), 2025-2026 Regular Session: new O.C.G.A. Title 43, Chapter 14, Georgia General Assembly. Accessed October 10, 2026.
- SB 553: status history (Act 472, effective July 1, 2026), Georgia General Assembly. Accessed October 10, 2026.
- Rule 121-3-.04 Conditioned Air Contractor License, Georgia State Construction Industry Licensing Board (Rules and Regulations of the State of Georgia). Accessed October 10, 2026.
- Section 608 Technician Certification Requirements, U.S. Environmental Protection Agency. Accessed October 10, 2026.
- Senate Bill 125 (2025), as passed, Office of the Governor of Georgia (2025 signed legislation). Accessed October 10, 2026.
- How to Guide: Conditioned Air Contractor, Georgia Secretary of State. Accessed October 10, 2026.
- Board of Conditioned Air FAQ, Georgia Secretary of State. Accessed October 10, 2026.
- Georgia Construction Industry Licensing Board, Division of Conditioned Air Contractors: Licensure Examinations Candidate Information Handbook (November 2024), PSI Services LLC. Accessed October 10, 2026.
- Start Your Career in the Pipe Trades with a UA Apprenticeship, United Association (UA). Accessed October 10, 2026.
- Apprenticeship Job Finder, U.S. Department of Labor. Accessed October 10, 2026.
- Rule 121-2-.03 Statewide License by Reciprocity, Georgia State Construction Industry Licensing Board (Rules and Regulations of the State of Georgia). Accessed October 10, 2026.
- About the Board of Conditioned Air Contractors, Georgia Secretary of State. Accessed October 10, 2026.
- Rule 121-3-.05 Display of Business Registration Number, Georgia State Construction Industry Licensing Board (Rules and Regulations of the State of Georgia). Accessed October 10, 2026.
- Applicant Information, Mechanical Trades Institute (UA Local 72 joint apprenticeship and training). Accessed October 11, 2026.
- HVACR, Mechanical Trades Institute (UA Local 72 joint apprenticeship and training). Accessed October 11, 2026.
- Work-Based Learning, Georgia Department of Education. Accessed October 11, 2026.
- Georgia Work Based Learning / Youth Apprenticeship: Frequently Asked Questions, Georgia Work-Based Learning Program. Accessed October 11, 2026.
- Dual Enrollment, Georgia Student Finance Commission (GAfutures). Accessed October 11, 2026.
- Career, Technical, and Agricultural Education (CTAE), Georgia Department of Education. Accessed October 11, 2026.