Electrician · State license

How to get an electrician license in Georgia

State law and licensing-board sources · Last reviewed October 10, 2026

Georgia does not issue a state journeyman or apprentice electrician license. The state licenses electrical contractors in two classes: Class I (Restricted) and Class II (Unrestricted). Under a 2026 rewrite of the law (Act 472, in effect since July 1, 2026), Class I needs at least 3 years of full-time experience and Class II at least 4, plus a score of 70 on the state exam. The Board's own rules and guides still show the older requirements, so confirm with the Division. The license comes from the Division of Electrical Contractors of the State Construction Industry Licensing Board, part of the Georgia Secretary of State's office. [1][2][3][4]

New to the trade?

Starting from zero in Georgia

Georgia has no apprentice or journeyman electrician license, so there's nothing to file with the state before you start. Your first step is getting hired: by an electrical contractor, through the open-shop IEC (Independent Electrical Contractors) apprenticeship (no experience needed), or into a union IBEW (International Brotherhood of Electrical Workers)/NECA apprenticeship. Keep records of every job, because documented full-time years (2,000 hours each) are what later qualify you for a contractor license. [1][14][15]

  • High school diploma or GED

    No state rule for starting out, since Georgia has no apprentice license The Atlanta Electrical JATC's Inside Wireman and Telecommunications apprenticeships and IEC Atlanta both require a high school diploma or GED (General Educational Development test). The Electrical Training Alliance says JATCs (short for Joint Apprenticeship and Training Committee) may also accept a two-year associate degree instead. [1][14][15][16]

  • Register before you start work

    Nothing to register Georgia law sets up no apprentice or journeyman electrician license, only Class I and Class II contractor licenses. [1]

  • Minimum age

    No state age rule for electrical workers found The Board's rule says 21 for the contractor license (the 2026 law lists no age). IEC Atlanta takes youth apprentices at 16 through their high school's work-based learning program. [1][3][14]

  • Aptitude test and math

    Atlanta Electrical JATC (Inside Wireman and Telecommunications apprenticeships): an aptitude test in math, algebra and reading comprehension (score 5 of 9 points) $23 application fee plus $23 test fee. Electrical Training Alliance programs may ask for one full year of high school algebra with a passing grade. [15][16][17]

  • Getting hired

    IEC Atlanta helps you find a job with a member contractor, and you can also enroll on your own or while working for a non-member contractor The Atlanta JATC's programs require full-time work for a union contractor, and applying doesn't guarantee a job. [14][15][17]

  • Application windows

    As of October 2026, the Atlanta Electrical JATC's Spring 2027 applications are closed and Fall 2027 applications reopen in 2027 High school seniors on track to graduate can apply with transcripts. IEC Atlanta's job referral and classes run year round. [14][15][17]

  • Pay while you learn

    Atlanta JATC inside wireman: $18.00 an hour to start, with 5 pay levels. IEC Atlanta: entry wages average $17 to $20 an hour Tuition for member contractors' employees is $1,495 a year plus $600 to $900 for books. [14][15]

  • Credit for school or military

    Under the 2026 law, a 2-year electrical contracting diploma or certificate plus 2 years of experience qualifies you for Class I, and a Department of Labor approved apprenticeship is a listed route. The Atlanta JATC reviews electrical-program diplomas for transfer credit and waives its application fee for veterans with a DD-214 (military discharge papers). [1][15][17]

  • Still in high school?

    Georgia's Work-Based Learning program (state Department of Education) includes Youth Apprenticeship, which pairs high school coursework with paid work Its program site says students must be in grades 11 or 12, at least 16 and in good academic standing. Dual Enrollment lets Georgia high school students take college courses with standard tuition, mandatory fees and required books covered; IEC Atlanta takes youth apprentices at 16 with counselor approval. Georgia's Department of Education offers CTAE career pathways in high school. The 2026 licensing law's school credit is for 2-year diploma or certificate programs in electrical contracting at a technical college, university or other institution the division recognizes; it doesn't mention high school courses. [1][14][18][19][20][21]

Licensing office Division of Electrical Contractors, Georgia State Construction Industry Licensing Board (Secretary of State) [4][8]

Georgia electrician license at a glance

Who issues licenses
Division of Electrical Contractors, State Construction Industry Licensing Board Georgia Secretary of State [4]
Journeyman license
None at state level: the law's electrician licenses are Class I and Class II electrical contractor [1][3]
License classes
Class I: single-family homes up to 3 levels and multifamily up to 2 levels, single-phase service up to 400 amps (2026 law; the Board's rule still says 200 amps). Class II: unrestricted. [1][3]
Experience
2026 law: Class I, 3 years full-time Class II, 4 years, at least 2 on three-phase systems (1 year = 2,000 hours). The Board's rule still says 4 years for both. [1][3]
Minimum age
21 under the Board's rule The 2026 law doesn't list an age [1][3]
Exam
Two parts, 8 hours total 70 scaled score to pass; open book with listed references only (2023 NEC) [1][6]
Application fee
$110 (Class I or Class II, by exam) [5]
Renewal + CE
Every 2 years, by June 30 of even-numbered years 4 hours of continuing education per year (Board rule) [1][5][9]
Reciprocity
Board guide: Class II (Non-Restricted) by reciprocity for exam-based licenses from Alabama, Louisiana, North Carolina, South Carolina and Tennessee [1][5]
On this page
  1. At a glance
  2. Starting from zero
  3. The license pathway
  4. Georgia has no state journeyman electrician license
  5. The 2026 law change
  6. Class I vs. Class II: what each license covers
  7. Experience: what counts
  8. The exam
  9. Fees and renewal
  10. Union and open-shop apprenticeships in Georgia
  11. If you're licensed in another state
  12. Military members and spouses
  13. Steps to get licensed
  14. Where to get the hours
  15. Licensed in another state?
  16. Questions people ask

The license pathway in Georgia

  1. 1

    Electrical experience (no state license)

    Georgia law sets up no apprentice or journeyman electrician license, so there is no state registration step. What counts is documented full-time experience "gained through the direct installation of electrical systems and directly related activities of a type covered by the National Electrical Code." [1][3]

  2. 2

    Class I Electrical Contractor (Restricted)

    • 3 years of experience
    • Not required; a 2-year electrical contracting diploma or certificate plus 2 years of experience, or a completed DOL-approved electrical apprenticeship, is an alternative route
    • Yes: two parts (30 law/business questions + 110 technical questions), 8 hours total, 70 scaled score to pass, PSI (a testing company)
    • $110 application
    • Every 2 years; 4 hours CE per year

    Under the 2026 law, Class I covers single-family homes of up to three levels and multifamily buildings of not more than two levels with single-phase service of up to 400 amps. You need 3 years of full-time experience covering at least five listed work areas plus load calculations, and a sworn experience affidavit. The Board's rule still says 200 amps, 4 years, age 21 and three references. [1][3][5][6][9]

  3. 3

    Class II Electrical Contractor (Unrestricted)

    • 4 years of experience
    • Not required; a completed DOL-approved electrical apprenticeship plus 1 year of three-phase work is an alternative route
    • Yes: two parts (30 law/business questions + 110 technical questions), 8 hours total, 70 scaled score to pass, PSI
    • $110 application
    • Every 2 years; 4 hours CE per year

    No restriction on the work. Under the 2026 law you need 4 years of full-time experience, at least 2 of them installing, altering or repairing three-phase systems, including work above single-phase 200 amps and all the listed work areas. [1][3][5][6][9]

Georgia has no state journeyman electrician license

Many states license electricians in steps: apprentice, then journeyman, then master. Georgia doesn't. The law lists every license the State Construction Industry Licensing Board issues, and for electricians there are only the two electrical contractor classes, Class I and Class II. The same list includes a Journeyman Plumber license, which shows the gap is specific to electricians.

So there is no state apprentice registration to file and no journeyman exam to take. What the state looks at, when you apply for a contractor license, is your documented experience. The law says "No person shall engage in electrical contracting unless such person has a valid license issued by the division," and a company may do electrical contracting only if a licensed person works with it full time. [1][3]

The 2026 law change

In 2026 Georgia repealed and rewrote the law for electrical, plumbing, conditioned air, low voltage and utility contractors (Chapter 14 of Title 43 of the Georgia Code). The bill was Senate Bill 553, signed May 11, 2026 as Act 472, and it took effect July 1, 2026. For electricians it:

As of October 10, 2026, the Board's rule (Rule 121-3-.01), its how-to guide and its application checklist still show the old requirements: 4 years for both classes, Class I limited to 200 amps, a minimum age of 21 and three references. The law is newer, but the Division decides how it applies them, so confirm with the Division before you apply. [1][2][3][5]

Class I vs. Class II: what each license covers

Both classes need a passing score of 70 on their own exam. The difference is the scope of work, the years of experience and the work you must show. Class I applicants document projects in at least five of seven listed areas (raceways, conductors, service entrances, motors and generators, switches and controls, special occupancies, grounding and bonding) plus load calculations. Class II applicants must show all of them, plus work on installations above single-phase 200 amps. [1][3]

Experience: what counts

The 2026 law counts "working experience gained through the direct installation of electrical systems and directly related activities of a type covered by the National Electrical Code" (NEC, the national wiring rulebook). A year of full-time experience means at least 2,000 hours worked in a calendar year. You qualify for each class by one of these routes:

The Board's older rule, not yet updated, asks for 4 years of "Primary experience" for both classes, allows up to 1 year of credit for secondary experience (such as teaching electrical code or working as an electrical inspector, counted at half rate) or education, and has a separate 6-year route for people who ran the business side of electrical contracting. The new law doesn't mention those, so ask the Division whether they still count. [1][3]

The exam

Exams are given at PSI test centers. The handbook was prepared by PSI and the state's Examination Development and Testing Unit. You can't schedule until the Board approves you.

Veterans who served at least 90 days during a period of conflict or war may qualify for exam preference points (send your DD-214). [1][5][6][7]

Fees and renewal

The application fee for a Class I or Class II license by exam is $110. The Secretary of State posts all other fees in its fee schedule. Exam fees aren't refundable.

Licenses are valid for two years. The Board says to renew online "by June 30 of even-numbered years." The 2026 law allows late renewal for up to 31 days after expiration, which matches the how-to guide's July 1 to July 31 window. The Board's home page, though, says the late period for the 2026 cycle runs July 1 to August 15, 2026. Confirm with the Division before counting on a later date.

Continuing education (CE, approved classes taken while licensed): the Board's rule requires 4 hours per year, and the law says CE hours can't be carried over to the next renewal. The Board tracks CE through CE Broker. If you were first licensed one year or less before your first renewal, you don't need CE that time. If your license has been lapsed 3 years or more, the Board's rule says you must file a reinstatement application and pass the exam again; the 2026 law says the extra requirements for such cases "may include" a new exam and an experience affidavit. [1][5][6][8][9]

Union and open-shop apprenticeships in Georgia

Because Georgia has no apprentice license, an apprenticeship here is about training and documented experience, not a state permit. Under the 2026 law, completing an electrical apprenticeship program accredited or approved by the U.S. Department of Labor is one of the listed routes to a contractor license.

More background: electrician apprenticeships. [1][10][11][12]

If you're licensed in another state

The 2026 law lets the Division, at its discretion, license you without the exam if your state's requirements are "substantially equal" to Georgia's, you have been "principally engaged" in the work for at least 2 years right before you apply, and your state gives Georgia licensees the same privilege.

The Board's application guide lists one path today: a Non-Restricted (Class II) license by reciprocity if you hold "a current license with no violations and obtained by exam from Alabama, Louisiana, North Carolina, South Carolina, or Tennessee." Under the Board's rule, you must still document that you meet Georgia's experience requirement, and licenses granted under grandfather clauses without an exam don't qualify. The application needs three references, a background check and verification of your out-of-state license.

See the license reciprocity guide and North Carolina's electrician page for the other side of that agreement. [1][5][7]

Military members and spouses

Under the 2026 law, a state committee decides which military specialties or certifications substantially meet the requirements for an Electrical Contractor Class I license. Current or former service members with such a specialty can apply for expedited licensing, generally within two years of discharge.

Under the Board's rule, military spouses and transitioning service members (within 24 months of retirement or 12 months of separation) can also ask for expedited processing if they meet the license requirements and pay the fee. Veterans may also be eligible for exam preference points. [1][5][7]

Steps to get licensed in Georgia

  1. Build documented full-time electrical experience

    Work hands-on installing electrical systems covered by the National Electrical Code. Under the 2026 law, Class I needs 3 years (five listed work areas plus load calculations) and Class II needs 4 years, at least 2 on three-phase systems. A year of full-time experience means at least 2,000 hours. A union or open-shop apprenticeship is one way to get it. [1]

  2. Get sworn experience affidavits

    The 2026 law asks for a signed affidavit, made under oath, from the licensed contractor who supervised you (or a licensed architect, professional engineer or electrical engineer), with a separate one from each supervisor. The Board's rule and application checklist still ask for three references, one from a licensed electrical contractor, so confirm with the Division which forms it wants. [1][3][5]

  3. Apply in GOALS (Georgia Online Application Licensing System) and pay the fee

    Create an account in GOALS, pick Electrical Contractor Restricted (Class I) or Non-Restricted (Class II), upload the checklist items (notarized application, background check, work experience, references, proof of citizenship or immigration status) and pay the $110 fee. [5]

  4. Get Board approval, then schedule the exam with PSI

    The Board must approve you before you can test. PSI then sends instructions to schedule at test-takers.psiexams.com/gaco. Bring only the listed reference books. [5][6]

  5. Pass with a scaled score of 70

    The exam has two 4-hour parts. If you fail twice, you must complete an approved review course before a third attempt. [1][6][7]

  6. Renew every two years with CE

    Renew online by June 30 of even-numbered years and report 4 hours of continuing education for each year since your last renewal. CE hours don't carry over to the next renewal. [1][5][9]

Where to get the hours

Programs that train electricians in or for Georgia, from their own official pages. Listed by type, not ranked.

Licensed in another state?

  • Electrical Contractor, Class II (Non-Restricted): AL, LA, NC, SC, TN

    The Board's guide says you can apply by reciprocity if you hold a current license with no violations that you obtained by exam in one of these states. Licenses earned under grandfather provisions without an exam don't qualify, and you still have to show you meet Georgia's experience requirement. On the other side, the Alabama Board of Electrical Contractors says it "no longer shares reciprocity with Georgia," so confirm with both boards before you apply. [5][7][13]

Also listed by: Delaware, Florida, North Carolina (their own boards list Georgia as a partner; check both sides before you move).

Open the reciprocity map · How reciprocity works

AlaskaAK MaineME VermontVT New HampshireNH WashingtonWA IdahoID MontanaMT North DakotaND MinnesotaMN IllinoisIL WisconsinWI MichiganMI New YorkNY Rhode IslandRI MassachusettsMA OregonOR NevadaNV WyomingWY South DakotaSD IowaIA IndianaIN OhioOH PennsylvaniaPA New JerseyNJ ConnecticutCT CaliforniaCA UtahUT ColoradoCO NebraskaNE MissouriMO KentuckyKY West VirginiaWV VirginiaVA MarylandMD DelawareDE ArizonaAZ New MexicoNM KansasKS ArkansasAR TennesseeTN North CarolinaNC South CarolinaSC District of ColumbiaDC OklahomaOK LouisianaLA MississippiMS AlabamaAL GeorgiaGA HawaiiHI TexasTX FloridaFL
GA Listed here (agreement or endorsement) Lists GA

Questions people ask

Does Georgia have a journeyman electrician license?

No. Georgia's statewide electrician licenses are the Class I (Restricted) and Class II (Unrestricted) electrical contractor licenses. The law sets up no apprentice or journeyman electrician license. [1][3]

How many years of experience do I need for a Georgia electrical contractor license?

Under the 2026 law, 3 years of full-time experience for Class I and 4 years for Class II, with at least 2 of the 4 on three-phase systems. A year means at least 2,000 hours. School and apprenticeship routes also exist. The Board's older rule still says 4 years for both classes, so confirm with the Division. [1][3]

What is the difference between a Class I and Class II electrical license in Georgia?

Under the 2026 law, Class I covers single-family homes of up to three levels and multifamily buildings of up to two levels with single-phase service of up to 400 amps (the Board's rule still says 200 amps). Class II is unrestricted, and you must document three-phase work and installations larger than single-phase 200 amps. [1][3]

Is the Georgia electrical contractor exam open book?

Yes, but you may bring only the references on the exam handbook's list, such as the 2023 National Electrical Code and the NASCLA business and law guide. The exam has two 4-hour parts and you need a scaled score of 70. [6]

Which states have electrical reciprocity with Georgia?

The Board's guide lists Alabama, Louisiana, North Carolina, South Carolina and Tennessee for a Class II (Non-Restricted) license, if your license was obtained by exam and has no violations. The 2026 law also lets the Division license people from states with substantially equal requirements that return the favor, after 2 years of practice. [1][5]

How much continuing education do Georgia electrical contractors need?

Four hours per year under the Board's rule, reported when you renew every two years, and hours don't carry over. You don't need CE for your first renewal if you were licensed one year or less before it. [1][9]

Sources (21)
  1. Senate Bill 553 (As Passed), 2025-2026 Regular Session: new O.C.G.A. Title 43, Chapter 14, Georgia General Assembly. Accessed October 10, 2026.
  2. SB 553: status history (Act 472, effective July 1, 2026), Georgia General Assembly. Accessed October 10, 2026.
  3. Ga. Comp. R. & Regs. Chapter 121-3, Application for Licensure (Rule 121-3-.01 Statewide Electrical Contractor License), Georgia Secretary of State, Rules and Regulations of the State of Georgia. Accessed October 10, 2026.
  4. About the Georgia State Board of Electrical Contractors, Georgia Secretary of State. Accessed October 10, 2026.
  5. How-To Guide: Electrical Contractors, Georgia Secretary of State. Accessed October 10, 2026.
  6. Georgia Construction Industry Licensing Board, Division of Electrical Contractors: Candidate Information Handbook (November 2024), PSI Services and the Georgia Examination Development and Testing Unit. Accessed October 10, 2026.
  7. Ga. Comp. R. & Regs. Chapter 121-2, Qualifications for Licensure, Georgia Secretary of State, Rules and Regulations of the State of Georgia. Accessed October 10, 2026.
  8. Georgia State Board of Electrical Contractors, Georgia Secretary of State. Accessed October 10, 2026.
  9. Ga. Comp. R. & Regs. Chapter 121-4, License Issuance, Renewal, Reinstatement, Expiration, and Inactivation, Georgia Secretary of State, Rules and Regulations of the State of Georgia. Accessed October 10, 2026.
  10. Locate a Training Center: Inside Wireman, electrical training ALLIANCE (IBEW and NECA). Accessed October 10, 2026.
  11. IEC Atlanta: Apprenticeship, Independent Electrical Contractors, Atlanta Chapter. Accessed October 10, 2026.
  12. Apprentice Georgia, Technical College System of Georgia. Accessed October 10, 2026.
  13. Reciprocity Applications, Alabama Board of Electrical Contractors. Accessed October 11, 2026.
  14. Apprenticeship Program, Independent Electrical Contractors, Atlanta & Georgia Chapters. Accessed October 11, 2026.
  15. Application Requirements: Which Program is Right for Me?, Atlanta Electrical JATC (IBEW Local 613 and NECA). Accessed October 11, 2026.
  16. The Application Process, electrical training ALLIANCE (IBEW and NECA). Accessed October 11, 2026.
  17. Application Process & Required Documents, Atlanta Electrical JATC (IBEW Local 613 and NECA). Accessed October 11, 2026.
  18. Work-Based Learning, Georgia Department of Education. Accessed October 11, 2026.
  19. Georgia Work Based Learning / Youth Apprenticeship: Frequently Asked Questions, Georgia Work-Based Learning Program. Accessed October 11, 2026.
  20. Dual Enrollment, Georgia Student Finance Commission (GAfutures). Accessed October 11, 2026.
  21. Career, Technical, and Agricultural Education (CTAE), Georgia Department of Education. Accessed October 11, 2026.